Here are a few photos of the work on the new bunny barn! It's 32 x 12 feet with an inside part and outside runs for them as well. Everything is on a skid so we can move the barn around the farm as needed. We picked up some sky light tin, the door and a window this week that we need to build the final wall and have been working today to cut all the tin and get it put on so we can start using the new barn before Christmas. It'll be an early Christmas present to the bunnies!
Raising Holland Lops since 2000 we are located near Beaverlodge Alberta Canada and we strive to produce excellent show quality tri and tort Holland Lops.
Saturday, November 22, 2014
Tuesday, November 4, 2014
The work on the new bunny barn continues. . .
As I write this post the guys are working on welding the pipe braces for the roof onto the piece of pipe on the ground that works as a skid so we can move this barn around. The insulated part has the floor done, walls framed and next is the roof then we can insulate and do a little painting!
The weather has been beautiful here even though there's snow on the ground the temperatures have been staying well above zero so the bunnies have been enjoying the fall!
We'll post some photos of the barn once we get the roof started - stay tuned for those!
The weather has been beautiful here even though there's snow on the ground the temperatures have been staying well above zero so the bunnies have been enjoying the fall!
We'll post some photos of the barn once we get the roof started - stay tuned for those!
Subscribe to:
Posts (Atom)